<blockquote id="vf288"></blockquote>
<ruby id="vf288"></ruby>

<dl id="vf288"></dl>
<noscript id="vf288"><tbody id="vf288"></tbody></noscript>

<noscript id="vf288"><li id="vf288"></li></noscript>

    熱線電話:

    0531-85821210

    資訊中心
    您當(dāng)前位置: 首頁>>資訊中心

    私人訂制轉(zhuǎn)盤套的過程大致分為五步

    時間:2023-05-04 來源:http://www.xcnmpx.com/

    轉(zhuǎn)盤套通常是一種用于保護轉(zhuǎn)盤表面的外套,可以幫助延長轉(zhuǎn)盤的使用壽命。它們通常是由柔軟的材料,如絨面布、尼龍或皮革制成。轉(zhuǎn)盤套的尺寸和形狀應(yīng)該與轉(zhuǎn)盤的尺寸和形狀相匹配,以確保保護效果。下面酒店布草廠家來講講私人訂制轉(zhuǎn)盤套的過程分為以下幾步:
    The turntable sleeve is usually a jacket used to protect the surface of the turntable, which can help extend the service life of the turntable. They are usually made of soft materials such as suede, nylon, or leather. The size and shape of the turntable sleeve should match the size and shape of the turntable to ensure protection. Below, the hotel linen manufacturer will talk about the process of customizing a turntable cover for personal use, which can be divided into the following steps:
    步驟1:需求確認。客戶需要提供轉(zhuǎn)盤大小、形狀和所需材料等詳細需求,以確保訂制的轉(zhuǎn)盤套符合客戶的要求。
    Step 1: Requirement confirmation. The customer needs to provide detailed requirements such as the size, shape, and required materials of the turntable to ensure that the customized turntable sleeve meets the customer's requirements.
    步驟2:設(shè)計繪制。設(shè)計師將根據(jù)客戶需求和要求,繪制出轉(zhuǎn)盤套的設(shè)計圖,并提供相關(guān)材料的樣品供客戶選擇。
    Step 2: Design and draw. The designer will draw a design diagram of the turntable sleeve based on customer needs and requirements, and provide samples of relevant materials for customers to choose from.
    酒店布草
    步驟3:樣品確定。客戶從提供的樣品中選擇滿意的材料,確認設(shè)計圖和材料后,簽訂合同,支付定金。
    Step 3: Sample determination. The customer selects satisfactory materials from the provided samples, confirms the design drawings and materials, signs a contract, and pays a deposit.
    步驟4:生產(chǎn)制作。生產(chǎn)部門按照設(shè)計圖紙和客戶需求,進行生產(chǎn)制作轉(zhuǎn)盤套。制作完成后,進行質(zhì)量檢驗。
    Step 4: Production and production. The production department produces turntable sleeves according to the design drawings and customer requirements. After the production is completed, quality inspection will be carried out.
    步驟5:交付驗收。客戶進行轉(zhuǎn)盤套的驗收,確認符合需求和質(zhì)量要求后,支付余款,轉(zhuǎn)盤套交付客戶。
    Step 5: Delivery acceptance. After the customer conducts the acceptance of the turntable cover and confirms that it meets the requirements and quality requirements, the remaining payment is made and the turntable cover is delivered to the customer.
    私人訂制轉(zhuǎn)盤套的過程需要客戶提供詳細需求,設(shè)計師繪制設(shè)計圖和提供樣品,生產(chǎn)部門進行生產(chǎn)制作,后交付給客戶并進行驗收確認。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://www.xcnmpx.com咨詢吧!
    The process of customizing the turntable cover privately requires the customer to provide detailed requirements, the designer to draw design drawings and provide samples, the production department to carry out production, and then deliver it to the customer for acceptance confirmation. For more related content, come to our website http://www.xcnmpx.com Consult!